1.8 m³ per batch. Yunnei 490 turbo. Turns in 5270 mm.
The JBC-1.8 loads, mixes and pours in one pass — 1.8 m³ concrete output per batch from a 2680 L geometric drum. Yunnei 490 turbocharged engine, 58 kW, ZL-265 gearbox with 4 forward and 4 reverse gears. Overall 7300×2650×3750 mm, wheelbase 2600 mm, curb weight 6000 kg.
Productivity, parts, delivery, paperwork, cost, operators
8 m³ per batch, drum turns at 13 r/min — cycle time video from a working site, request the link.
filters, belts and major components matched to local suppliers.
35 day lead time with a contract penalty clause — dates you can hold us to.
ZL-265 gearbox, 4 forward and 4 reverse
8 m³ per batch, drum turns at 13 r/min — cycle time video from a working site, request the link.
filters, belts and major components matched to local suppliers.
35 day lead time with a contract penalty clause — dates you can hold us to.

Test video with the measurements on screen
Village lanes and farm tracks are where full-size transit mixers stop. At 7300×2650×3750 mm with a 2600 mm wheelbase and a 5270 mm minimum turning radius, the JBC-1.8 gets into yards and onto embankments that would block a larger truck. Gradeability is rated at 30°, and we send the slope test with the angle and distance readings visible rather than a claim in a brochure.

Full spec PDF available — request it with your port details
| Model | JBC-1.8 |
|---|---|
| Mixing drum capacity | 1.8 m³ (geometric 2680 L) |
| Engine | Yunnei 490 turbo 58 kW (opt. Yuchai 4102 turbo 75 kW) |
| Transmission | ZL-265, 4 forward / 4 reverse |
| Overall dimensions | 7300×2650×3750 mm |
| Wheelbase | 2600 mm |
| Curb weight | 6000 kg |
| Max speed | 30 km/h |
| Max gradeability | 30° |
| Min turning radius | 5270 mm |
| Drum rotation speed | 13 r/min |
| Concrete output per batch | 1.8 m³ |
| Fuel tank | 63 L |
| Hydraulic oil | 63 L |
| Water tank | 400 L |
| Hydraulic motor | BM5-160 |
| Hydraulic pump | Double pump CBFC 50/40 |
Customer photos, by region


Audit video and third-party inspection report
Straight answers
How long is lead time?
25–35 days from order confirmation, held by a contract penalty clause. Ask us to check stock first — if a unit is on the yard, it ships in days.
Can I source Yunnei 490 parts locally?
Usually yes. We send the parts cross-reference with OEM and equivalent numbers for filters, belts and major components.
What paperwork comes with the truck?
ISO and CE packages, plus a road compliance checklist for your country.
What is the MOQ?
One unit, shipped with a free spare parts kit.
Can you quote landed cost?
Send your port and configuration — FOB, freight and estimated duties come back in one sheet within 24 hours.
Key parameters below. Full dimensional drawings, tolerance sheets and material certificates available on request.