Wisdom WinGROUP CO., LIMITED
Home/ 泵送混凝土机械/ WBZ系列稳定土拌合站(WBZ300T-WBZ800T)
泵送混凝土机械

WBZ系列稳定土拌合站(WBZ300T-WBZ800T)

300-800m³/h stabilized soil plants. Stationary or wheel-mounted. Weighing accuracy in the contract.

WBZ300T through WBZ800T covers 300, 500, 600 and 800m³/h theoretical output. Four aggregate bins at 8m³ each, 3.5m discharge height, mixer motors from 55kW to 110kW. The batching system handles soil, sand, lime, cement and fly ash with aggregate at ±2% and cement at ±1% — tolerances we write into the sales contract and back with a factory calibration report.

Stationary units need a concrete foundation and suit highway sections above 500t/h. Mobile units carry wheels and tow behind a tractor unit, 300-500t/h, 2-3 days to relocate. If you are comparing models, send us the project tonnage and site layout — we reply with the model match, foundation drawing and current lead time.

  • Theoretical output: 300-800m³/h
  • Mixer motor: 55-110kW
  • Total power: 98-315kW
  • Aggregate bins: 4×8m³
  • Discharge height: 3.5m
  • Weighing accuracy: aggregate ±2%, cement ±1%
#34 · SKU
WBZ系列稳定土拌合站(WBZ300T-WBZ800T)
Batching accuracy

Load cells and PLC you can name, tolerances you can enforce

Mettler-Toledo load cells, Siemens PLC, calibration report with every unit

Four models, one comparison sheet

WBZ300T/500T/600T/800T with output, motor kW and total power side by side, so you pick by tonnage rather than guesswork

Standard models ship in 30-45 days; in-stock units can go out sooner

ask for the current stock list before you commit to a schedule

Stationary vs mobile

we hand over a transfer time and cost sheet (2-3 days relocation for mobile) so the decision is on paper, not in a brochure

Relocation

Mobile units move in 2-3 days — here is what that costs

Wheels, tow bar, and a transfer sheet before you sign

Four models, one comparison sheet

WBZ300T/500T/600T/800T with output, motor kW and total power side by side, so you pick by tonnage rather than guesswork

Standard models ship in 30-45 days; in-stock units can go out sooner

ask for the current stock list before you commit to a schedule

Stationary vs mobile

we hand over a transfer time and cost sheet (2-3 days relocation for mobile) so the decision is on paper, not in a brochure

Mixer

Twin-shaft compulsory mixer, 55-110kW

Wear liners and blades sized for continuous subgrade work

Four models, one comparison sheet

WBZ300T/500T/600T/800T with output, motor kW and total power side by side, so you pick by tonnage rather than guesswork

Standard models ship in 30-45 days; in-stock units can go out sooner

ask for the current stock list before you commit to a schedule

Stationary vs mobile

we hand over a transfer time and cost sheet (2-3 days relocation for mobile) so the decision is on paper, not in a brochure

Highway, railway and municipal base course work
Feature

Highway, railway and municipal base course work

Reference projects and video factory inspection

WBZ plants produce cement-stabilized and lime-stabilized base material for expressway sections, railway subgrade and municipal roads. We can share reference projects of similar tonnage and arrange a video walk-through of the factory and a running unit, so you see the build quality before the order.

Where It Works
Feature

Where It Works

  • Highway base course material (expressway, national and provincial roads)
  • Railway subgrade stabilized soil mixing
  • Municipal road base construction
  • Airport runway base course
  • Large long-term projects with stationary plants above 500t/h
  • Multi-site contracts using mobile plants at 300-500t/h
Stationary vs mobile

Two configurations, one decision table

Output, foundation, relocation time, project type

Generic Market Alternatives

  • Unknown material source & batch inconsistency
  • No compatibility verification for your machine model
  • Lead times stretch 3-8 weeks with no clear status updates
  • Weak or non-existent post-sales engineering support
Model data

WBZ300T to WBZ800T side by side

Output, motor power, total power, bins, discharge height

Model
WBZ300T / WBZ500T / WBZ600T / WBZ800T
Theoretical output
300 / 500 / 600 / 800 m³/h
Mixer model
WBZ300 / WBZ500 / WBZ600 / WBZ800
Mixer motor power
55 / 75 / 90 / 110 kW
Total power
98 / 146 / 165 / 315 kW
Aggregate bins
4 units
Bin capacity
8m³ × 4
Finished silo discharge height
3.5m
Weighing accuracy
Aggregate ±2%, cement ±1%
Mobility
Stationary (concrete foundation) / Mobile (wheel-mounted, towable)
Questions buyers actually ask

Model choice, relocation cost, accuracy, lead time

Short answers, no filler

WBZ300T or WBZ800T — how do I choose between them?
WBZ300T runs 300m³/h on a 55kW mixer motor and 98kW total power; it fits mid-size contracts and sites that move. WBZ800T runs 800m³/h on a 110kW motor and 315kW total power; it fits expressway sections where the plant stays put for a year or more. Tell us the monthly tonnage and whether the site relocates, and we send the matching model with the comparison sheet.
Stationary or mobile — what does relocating actually cost and take?
Mobile plants carry wheels and tow behind a tractor unit; relocation takes about 2-3 days including disassembly of the discharge section. Stationary plants sit on a concrete foundation and are not designed to move. The cost difference is mostly transport plus foundation work on the stationary side. We send a transfer time and cost sheet so you can compare against your contract schedule.
Which brands are inside the control and weighing system?
Load cells are Mettler-Toledo class, PLC is Siemens. The quotation includes a brand list and a compatible spare parts table so you can cross-reference what you already stock. Common wear parts sit in our depot for 48-hour dispatch.
Is the ±2% / ±1% accuracy guaranteed in writing?
Yes. Aggregate ±2% and cement ±1% go into the sales contract, and each plant ships with a factory calibration report. The batching controller logs the ratio in real time during continuous production.
What certification and packing come with export orders?
CE and ISO documentation, wooden crate or steel frame packing depending on unit size, and a detailed packing list for customs. We prepare the export document set with the shipment.
What is the lead time, and do you keep stock?
Standard models are 30-45 days from order confirmation. Some models are in stock and can ship faster. Send the model and destination port — we reply with the current stock status and sailing schedule.
Do you support installation and after-sales outside China?
We supply the foundation layout drawing and site adaptation check free of charge, and can send an engineer for commissioning. After-sales runs on 48-hour response with remote PLC debugging; common spare parts ship from our depot.
Can the plant work with a cement silo or fly ash silo?
Yes. The batching system accepts cement and fly ash silos, and we provide the interface drawing and screw conveyor specification. Send your silo capacity and we confirm compatibility before the order.
Next step

Send capacity and site layout — get model match, price, lead time

Reply within 24 hours, foundation drawing included

Send Inquiry Back to 泵送混凝土机械
GUARANTEED RESPONSE
Reply Within 24 Hours
  • Compatibility check against your machine model
  • Unit price + MOQ + stock status
  • Lead time & worldwide shipping options
  • Datasheet, drawing & certificate package
Submit RFQ Now →